HOME ABOUT US PRODUCT APPLICATION TURN-KEY PROJECTS SERVICES REFERENCE LIST RECENT PROJECTS
 
 
  HOME   INFRASTRUCTURE   CAREERS   SITEMAP   ENQUIRY   CONTACT US
>> RECENTLY COMPLETED PROJECTS
  • Zircar Crucibles Pvt. Ltd, Mehsana
  • S.B. Industries, Mysore
  • Leo Metal Works Pvt. Ltd, Bangalore
  view details
>> ONGOING PROJECTS
  • Ajanta Ltd, Morbi
• PTC Industries Ltd, Lucknow
  view details
    OUR PRODUCT RANGE  
 
BURNERS
FURNACES
OVENS
HOT AIR GENERATORS
PIPING TRAIN
CONTROLS
MANIFOLDS
CONVERSIONS
FURNACE REVAMPING
 
 
RECENT PROJECTS
Knackwell Engineers has been providing solutions from past 15 years and have expertise on a variety of applications. Here are few projects completed in recent past and few on-going projects :

RECENTLY COMPLETED PROJECTS

Ajanta Ltd - MORBI

• Aluminum Annealing Furnace of 3 MT Capacity – 1 Nos
• Aluminum Melting Furnace Oil Fired 500 Kg Capacity – 6 Nos

Industrial Boilers Limited - VAPI
• Stress Relieving Furnace of 30 MT Capacity.
• Tube Normalizing Furnace of 108 tube.

Leo Metal Craft Pvt. Ltd - BANGALORE
• Aluminum Circle Annealing Furnace of 10 MT and 3 MT.

Heavy Engineering Ltd - KENYA
• Heat Treatment Calibration for Stress Relieving Furnace.

Capso Engineers - HALOL
• Aluminum Annealing Furnace with Pre-heating Chamber.

Devarsons Industries Pvt. Ltd - AHMEDABAD
• Hot Air Generator for Spray Dryer.

Indian Chemical Pvt. Ltd - AHMEDABAD
• Hot Air Generator for 4 Tray Dryer

Ratnachintamani Metal - UMERGAON
• Copper Billet Heater
• Copper Sheet Annealing

PTC Industries Limited - CHATRAL
• Heat Treatment Furnace for Castings.

Sunil Metal Industries
• Aluminum Circle Annealing Furnace – 3 Nos

-----------------------------------------------------------------------------------------------------------

ONGOING PROJECTS


Zircar Crucible Pvt. Ltd
• Curing Oven for Crucibles – 3.8 MT

Anar Chemical Pvt. Ltd
• Hot Air Generator for Tray Dryers

S.B. Industires
• Aluminum Circle Annealing Furnace – 2 MT

Ace Manufacturing Pvt. Ltd
• Tray Dryer for Chemical Beads.

FURNACE DESIGN
FURNACE PERFORMANCE EVALUTIONS
FURNACE REVAMPS & IMPROVEMENTS
FLUE GAS ANALYSIS

We conduct ON-SITE STUDY of :
  • Furnace installation
  • Application for which furnace is installed or desired
  • Furnace operation from view of combustion , process and operating procedures.
  • Present performance
  • Flue gas analysis
  • Heat balance and efficiency
We carry out RE-ENGINEERING of the installation to achieve :
  • Improved efficiency
  • Higher throughput
  • Better product quality
  • Lower maintenance / down time
  • Reduce pollution and noise
  • Better process parameters’ control
     
  The Knackwell Systems Achievements” by “KNACKWELL’S  GOALS”  
 
Excellent Efficiency
High Throughput Capacity
Effective frozen parameters
Low Pollution
Low noise
Strong Robust Construction
Maintenance Free/Low
down Time
Uniform Temperature
 
 
  All Rights Reserved by Knack Well.
Designed & Developed By : Attune Infocom Pvt. Ltd.